Detailed Notes on milled sleeper planks

As soon as the trench is dug, incorporate a concrete mixture to the bottom with the trench (about 50mm) and leave to partially dry.What are railway sleepers useful for? They’re laid horizontally under the metal railway tracks to hold them in place at the proper gauge. As such they’re the backbone of rail travel and a lot of them are applied eve

read more